Most Common Jobs
Top product
Banners: Finishing & Installing
Our most important product gets one full guide: hemming, grommets, and hanging a banner the right way, start to finish. Everything about banners lives here.
Open the guide →
Guide
Yard Signs
Coroplast signs, start to finish: cutting them down with an exacto blade, sliding on the H-stake, and putting them in the ground straight.
Open the guide →
Coming soon
Vehicle Wraps: Installing
Installing a vehicle wrap: surface prep, panels, squeegee work, and finishing the edges.
Coming soon
Perf Vinyl: Installing
Installing perforated window vinyl: clean glass, alignment, and a smooth, bubble-free finish.
Trainings in this department
Coming soon
Finishing a Job
Lamination, mounting, trimming, grommets, and packing: how a printed job becomes a finished job, ready to install or pick up.
Coming soon
RTA Preparation
Getting cut vinyl Ready To Apply: weeding, masking with transfer tape, and clean edges so letters never lift.
Coming soon
Laminating a Job
Running prints through the laminator: loading laminate, the settings we use, and a smooth finish with no wrinkles or silvering.
Coming soon
Working With Max Metal
Cutting, handling, and finishing Max Metal panels: clean edges, no scratches, ready to mount or ship.
Coming soon
Transporting Aluminum
Moving aluminum signs and blanks without bending or scratching them: padding, stacking, and strapping.
Coming soon
Work Orders & The Floor Screen
Production work is tracked in SD-Orders (Asana), and the Production section is up on the floor screen for the whole room. Change the Status and the task moves itself. When a job is done: Ready for Install, or Completed.
Coming soon
Outsourced Jobs & Vendors
Vendor jobs live in the Outsource section of SD-Orders. When Design sets Outsource Files Ready, the Production Manager places the order and moves it on when the items arrive.
Coming soon
Writing Production Notes
The shop standard: instructions live in the line item's Notes tabs, in sentence case. Production Notes are written after proof approval, including rush deadlines.
Installing
Window Film
3M Safety & Security Film Installation
How to install 3M Safety & Security window film correctly, with the IPA attachment system. Two training videos and a step-by-step checklist, plus what comes in the installer kit.
Start training →
Coming soon
Ready for Install
Jobs arrive in the Install section of SD-Orders when Production sets Ready for Install. Whoever finishes a job closes it out: check the checkmark, then set Status to Completed.
More installation trainings on the way
New installation trainings get added here as they are built.
Machines & Equipment
Laminator / Mounter
Laminator
Laminating materials.
Open page →
Laminator / Mounter
Mounting Table
Mounting table for applying prints and graphics to substrates.
Open page → Banner WeldingBanner Welder
Welding banner hems for strong, clean banner finishing.
Open page →
Service Equipment
Bucket Truck
Bucket truck for elevated sign work, by the hour or by the day.
Open page →